As part of the largest infrastructure project currently underway in the Netherlands, the new double track railway bridge over the A1 near Muiderberg, east of Amsterdam, was officially opened on 26th August 2016.
The project Schiphol-Amsterdam-Almere, abbreviated SAAone, is currently the largest road construction project in the Netherlands. The mega project includes i. a. the widening of the A1motorway from 2x3 to 2x5 lanes. Yet, the expansion could be only ensured if the existing concrete railway bridge at Muiderberg was replaced by a longer bridge. Because of the necessary required wide span, the most suitable solution consisted of a steel arched bridge without any intermediate support columns.
As much steel as the Eiffel Tower, 11 meters longer than the London Bridge, weight of approximately 7,600 cars…Such comparisons emphasize the impressive dimensions of this artwork. With a span of 255 m, a width of 17 m, a height of 55 m above ground and a weight of 8,400 t, it is one of the longest, if not the longest arch bridge without intermediate supports in Europe.
Slim structure, easily transportable, easy assembly of the prefabricated parts on site, these were the requirements for the design. In order to achieve these objectives, the designers and constructors set high demands to the materials and the welding technology to be used for the construction. Therefore, in order to reduce the weight, they selected the higher strength thermo-mechanically rolled steel S460M/ML. For the transverse tube beams they relied on the S355NL with highest requirements on the cold deformation (until 10 %).
For this bridge of superlatives, which won the Dutch Steel Award 2018, Dillinger supplied 8,250 t heavy plates, thereof round 7,000 t in the grade S460M/ML.
Opening date | August 2016 |
---|---|
Country | The Netherlands |
Quality | S355N/NL, S355K2+N,S460M/ML |
Architect | Zwarts & Jansma Architects |
Building owner | Rijkswaterstaat |
Operator | ProRail |
Length | 255 m |
Width | 17 m |
Height | 50 m |
Delivered quantity | 8,250 t |
Wall thickness | 15 – 120 mm |
Head of Sales Department, Wind Power & Construction
Tel.: +49 6831 473449
Fax: +49 6831 47992685
E-Mail
Head of Marketing & Technical Support, Wind Power & Construction
Tel.: +49 6831 472394
Fax: +49 6831 473089
E-Mail
Category Manager Sales, Steel Construction
Tel.: +49 6831 472196
Fax: +49 6831 47992681
E-Mail
Innovative top-quality steel products, total orientation around our customers' needs and unceasing technological development in close cooperation with our partners form the basis of our success - as they have for more than 333 years.
© 2016 Dillinger All rights reserved.
AG der Dillinger Hüttenwerke
Werkstraße 1
66763 Dillingen/Saar
Tel.: +49 6831 47 0
Fax: +49 6831 47 2212
E-Mail: info@dillinger.biz
Imprint
| Data privacy statement
| T&C