Meet our experts at the Tube 2024 in Düsseldorf read more...
• EnBW and SHS have concluded a 50MW power purchase agreement (PPA) from the planned EnBW offshore wind farm “He Dreiht” with a 15-year term • Steelwind Nordenham, a company of the Dillinger Group, is supplying the monopiles for the “He Dreiht” offshore wind farm • The green electricity will soon be used in Saarland’s steel industry to produce low-carbon steel • SHS covering annual consumption of approx. 200 GWh with the green electricity read more...
Meet our experts at the 19th Pipeline Technology Conference in Berlin read more...
Ørsted and Dillinger (Aktien-Gesellschaft der Dillinger Hüttenwerke) strengthen their partnership as the energy company secures first offer to procure Dillinger’s lower-emission heavy-plate steel for offshore wind foundations. Through the memorandum of understanding (MoU), Ørsted supports Dillinger’s efforts to drive the decarbonisation of steel production and leverages its influence to secure resilient supply chains, steel capacity, and the optionality to deliver on expected future costumer demands. read more...
Innovative top-quality steel products, total orientation around our customers' needs and unceasing technological development in close cooperation with our partners form the basis of our success - as they have for more than 333 years.
© 2016 Dillinger All rights reserved.
AG der Dillinger Hüttenwerke
Werkstraße 1
66763 Dillingen/Saar
Tel.: +49 6831 47 0
Fax: +49 6831 47 2212
E-Mail: info@dillinger.biz
Imprint
| Data privacy statement
| T&C