1,200 kilometers of Dillinger steel sunk
Langeled, at 1,200 kilometers the world's longest submarine pipeline, will carry natural gas from Nyhamna, in Norway, via the Sleipner distribution station in the North Sea, to Easington, in North-East England. The gas originates from the Ormen Lange field off the Norwegian coast. Langeled consists for the most part of heavy plate supplied by Dillinger, and if the very tonnage presents a challenge, the boundary conditions are an even greater one.
The pipes must be installed at depths of down to 900 meters, a task possible only with the assistance of submarine robots. Langeled handles up to 70 million cubic meters of gas daily, and up to 8,000 cubic meters of condensate, meeting the heating needs of around ten million UK residents.
Opening date | southern part operational since October 2006 to transport other Norwegian natural gas; northern leg operational since October 2007, when the Ormen Lange field came on-stream |
---|---|
Country | United Kingdom |
Quality | SAWL-485-I-FD |
Operator | Hydro, Gassco, Statoil |
Length | 1,200 km |
Diameter | northern section: 42 inches (1,067 mm) southern section: 44 inches (1,118 mm) |
Delivered quantity | 337,000 t |
Emplacement | west coast of Norway via Sleipner in the North Sea to Easington in UK |
Wall thickness | up to 35 mm |
Head of Sales Department, Energy Transmission & Processing
Tel.: +49 6831 472472
Fax: +49 6831 47992685
E-Mail
Head of Marketing &Technical Support, Energy Transmission & Processing, Protection Steel
Tel.: +49 6831 473612
Fax: +49 6831 473089
E-Mail
Innovative top-quality steel products, total orientation around our customers' needs and unceasing technological development in close cooperation with our partners form the basis of our success - as they have for more than 333 years.
© 2016 Dillinger All rights reserved.
AG der Dillinger Hüttenwerke
Werkstraße 1
66763 Dillingen/Saar
Tel.: +49 6831 47 0
Fax: +49 6831 47 2212
E-Mail: info@dillinger.biz
Imprint
| Data privacy statement
| T&C