In order to to meet Saudi Arabia‘s growing demand for gas, state-owned Saudi Aramco developed the das Karan Gasfeld in Khursaniyah.
The project is divided into an offshore and onshore package and comprises the construction of three main facilities: gas processing facility at the Manifa facility, platforms and power generation units, and subsea pipeline. The Karan Field produces 50 million m³ gas/day. For this project Dillinger delivered approximately 3,800 t to different customers. A vessel which was fabricated for this project from Dillinger plates is a so-called slug catcher. Slugcatcher is the name of a unit in the gas refinery or petroleum industry in which slugs at the outlet of pipelines are separeted. A slug is a large quantity of gas or liquid that exits the pipeline. The sluc catcher is located between the outlet of the pipeline and the processing equipment The vessel has a diameter of 4,572 mm, a length of 21,200 mm and a weight of 282 t. The design pressure is 69 bar / 5 bar (inner / outer) and the design temperature is 148.9 °C / 110 °C (inner / outer ). Dillinger has supplied 658 t of plate in thicknesses of 12 – 103 mm, width up to 3000 mm and length up to 12 m for this and other vessels.
Opening date | 2011 |
---|---|
Country | Saudi Arabia |
Quality | SA516-70 |
Operator | Saudi Aramco |
Pressure | Design pressure 69 bar / 5 bar (inner / outer) |
Length | 21200 mm |
Diameter | 4572 mm |
Type | Slug Catcher |
Single weight | 282 t |
Emplacement | Khursaniyah |
Innovative top-quality steel products, total orientation around our customers' needs and unceasing technological development in close cooperation with our partners form the basis of our success - as they have for more than 333 years.
© 2016 Dillinger All rights reserved.
AG der Dillinger Hüttenwerke
Werkstraße 1
66763 Dillingen/Saar
Tel.: +49 6831 47 0
Fax: +49 6831 47 2212
E-Mail: info@dillinger.biz
Imprint
| Data privacy statement
| T&C